NORTH ANDOVER, MA — T Ford Co. Inc. (TFCI) was contracted for the repair of failed slopes and reconstruction of a detention basin at a capped Municipal Solid Waste Landfill. Due to the nature of the failure and defects that were uncovered in the original construction, the project was closely monitored by the Massachusetts DEP. The slope repairs consisted of removing drainage and vegetative support layers down to the geomembrane in areas where there were slope failures. Later, TFCI reconstructed drainage swales, installed new under drains, added tri-planar drainage panels and replaced the drainage and vegetative support layers. All work was performed on 3H:1V slopes with limited access for materials and equipment without damaging the existing membrane.